Skip to Main Content
ADD A NEW IDEA

All ideas

Showing 14

Maintenance Request Automation

I want to automatically approve the maintenance request and create a work order from it without manual creation of order. It should work based on some specific criterias such as type of the request, priority, asset location, or asset category
Guest over 2 years ago in Maintenance Requests 2 Planned

Ability to filter Projects, so that only relevant Projects are made available in Dynaway.

The request is to filter the Projects so that only relevant Projects are made available in Dynaway. Similar to the existing functionality for Items, where you can mark it as a "Maintenance Item".
Guest 9 months ago in Dynaway EAM 0 Planned

Translation errors

Hi, I have noticed some errors in the translation Dynaway does when switching to Spanish, it would be beneficial for our clients in Mexico if this is resolved. Replace "Pedidos de trabajo" for "Solicitudes de orden de trabajo" Replace "Planes de ...
Virgilio Carrion 9 months ago in Dynaway EAM 1 Planned

Pre written maintenance packages for periodic maintenance

Possibility to add maintenance packages for periodic maintenance operations. Including used materials (oils, filters, gears, bearings etc), tools and resources. Possibility to add these packages to workorders for purhaces and upper level resource ...
Guest about 1 year ago in Dynaway EAM 1 Planned

Barcode scanning inventory items used on a work order

I'm working on WMS express in our inventory rooms and thought about how this could be integrated with work orders, such as adding items to a work order.
Guest about 2 years ago in Dynaway EAM 0 Planned

Register Counter based on BOM Component Consumption on Prod Order.

In our scenario, the tool is part of the Production BOM Component. We would like to have the possibility to automatically capture as counter reading value the quantity consumed on production order so it would be possible to trigger a work order pl...
Guest over 2 years ago in  0 Planned

Downtime Entry in WO

When creating a manual downtime entry in a work order you have to scroll down and find the asset number rather than having it defaulted from the work order asset number.
Nathan Bates 10 months ago in Dynaway EAM 0 Planned

Safe Work - Risk Assessment Precautions

In Safe Work Risk Assessments under precautions, there needs to be an open text column on each precaution to enable a person to add a note when a precaution action is required
Nathan Bates 12 months ago in Safe Work 0 Planned

Duration from previous change

In the History log, we can now see a date and time range from when the asset was last moved either by status or condition . It would be nice to see this on the asset card
Guest over 2 years ago in Dynaway EAM 0 Planned

Adding a forms section for Lock out

There is a need for adding a forms section to the lock out process in safe work as there a certain checks that need to be completed before and after the lock out processes are completed. This could be a form before a lock is attached and a form fo...
Nathan Bates about 1 year ago in Safe Work 0 Planned